Installation of Shanghai Liqing lifting column: practical suggestions for optimizing construction pe

Release time:2025-10-29View:
preliminary preparation
Provide CAD drawings of the site in advance or conduct underground pipeline exploration to avoid work stoppages due to pipeline issues during construction.
Coordinate with property or traffic management departments to determine a vehicle diversion plan during the construction period to reduce the impact on daily traffic.
Technical solution selection
If the construction period is tight, priority can be given to choosing the foundation free lifting column (such as the conventional model of Lixing), which does not require concrete pouring and shortens the installation time of a single column to 2 hours.
The control system with modular design can reduce on-site wiring time by 30%.
Contract terms binding
Clearly state the compensation clause for project delay in the installation agreement, and also specify the scope of exemption for force majeure (such as epidemics and extreme weather).
Shanghai Liqing is required to provide a "Construction Schedule" and set up key milestone inspections (such as foundation completion and system integration) to ensure that each link is controllable.

4、 Typical Case Reference
A commercial complex project in Shanghai
Scale: 20 fully automatic lifting columns+2 sets of license plate recognition systems.
Cycle: 15 days (including 3 days of system debugging).
Optimization measures: Adopt prefabricated concrete foundation modules to reduce on-site pouring time; The construction period is chosen at night (22:00-6:00) to avoid peak traffic.